
Media
Main Menu - Level 2


13.06.2025
During TOC Europe 2025, held from 17 to 19 June 2025 at Rotterdam, the TFKable team will showcase our advanced TFCrane cables, engineered for high-speed power and control in port cranes and material handling equipment across specialized industries.
We will also highlight the capabilities of our Extra High-Speed Cables Laboratory, where we conduct rigorous performance testing, including:
Monospiral Test – simulating repeated reeling and unreeling cycles to assess long-term cable durability
Festoon Test – evaluating cable endurance during multiple bending cycles using suspended cable trolleys
Drag Chain Test – measuring cable resilience under dynamic loads and mechanical stress
Visit us at Booth D56 to explore these tests in detail and discover how our TFCrane cables perform under real-world industrial challenges.
#TOC25 #Rotterdam #TFCrane #STS #RTS #Chain #Festoon #Reeling #TFKGroup
Go to our LinkedIn profile
We will also highlight the capabilities of our Extra High-Speed Cables Laboratory, where we conduct rigorous performance testing, including:
Monospiral Test – simulating repeated reeling and unreeling cycles to assess long-term cable durability
Festoon Test – evaluating cable endurance during multiple bending cycles using suspended cable trolleys
Drag Chain Test – measuring cable resilience under dynamic loads and mechanical stress
Visit us at Booth D56 to explore these tests in detail and discover how our TFCrane cables perform under real-world industrial challenges.
#TOC25 #Rotterdam #TFCrane #STS #RTS #Chain #Festoon #Reeling #TFKGroup
-
12.09.2024
Tele-Fonika Kable S.A. will supply onshore cables and accessories for the Bałtyk 2 and Bałtyk 3 offshore wind farms.
-
23.07.2024
Tele-Fonika Kable S.A. to Supply Cables and Accessories for the Construction of Key Infrastructure for the Baltica 2 Offshore Wind Farm, the Largest Wind Power Plant in Polish Baltic Sea Waters